The short answerSquare footage alone hides demolition, hauling, excavation, base correction, reinforcement, jointing, finish, drainage, access, and restoration. Two estimates may describe different slabs rather than different prices for identical work. Compare the written scope line by line before comparing totals.
Look for the work behind the number
Hand placement in a confined backyard and direct chute access from a street involve different labor and logistics. Thick existing concrete, buried footings, unsuitable soil, or limited disposal access can alter removal and preparation. A low number that omits these items is not necessarily comparable.
Finish choices and edge details also matter. Steps, thickened edges, curves, drains, exposed transitions, and special finishes change the operation. Ask whether layout, forming, placement, cleanup, and protection of adjacent surfaces are included.
Turn allowances into decisions
Unknown soil or buried objects cannot always be priced precisely before removal. A clear proposal can still explain allowances, unit rates, exclusions, and how a change will be approved. Vague language such as ‘base as needed’ leaves the most consequential part unresolved.
CB’s actual prices and inclusions must come from a project-specific estimate. Bring dimensions, access photographs, intended vehicle loads, and drainage concerns to that conversation. Ask for the same details from every bidder so the final choice reflects scope and expectations, not only the bottom line.
Before you approve the work
- Compare demolition and disposal allowances.
- Check excavation, base, thickness, and joint details.
- Identify finish, drainage, and restoration inclusions.
- Require written approval rules for changed conditions.